Turn-over Meetings: From Developer to Owners

stencil.default (35).jpgDevelopers have several obligations post-registration of a condominium, such as appointing a board of directors and the auditor, collecting fees, obtaining insurance, and registering the proposed by-laws. There are other tasks, such as arranging for a reserve fund study, performance audit, or repairs/maintenance, that might arise depending upon how long the developer controls the first board.

The developer must also call a meeting of owners on the later of the 30th day after 20% of the units have been transferred and the 90th day after the developer has first transferred title to a unit. At the meeting, the owners (other than the developer) may elect two new directors.  The meeting is not required if a majority of the units have been transferred and a meeting has been called to relinquish control to the owners (called the “turn-over meeting”). The turn-over meeting must be called within 21 days of the developer transferring a majority of the units and held within 21 days after it is called.  Continue reading